Bid Number
|
Description
|
Tech. Working on Bid |
Opening Date
|
Bid
Tab. |
PO Award |
Comments
|
|
(RFP) Upgrade of the Main Switch Gear at the Detention Facility |
Linda |
1/28/09 |
08-180-tab | RFP was awarded by Commissioner Court to Satin American Corp. on Monday, March 9, 2009
|
|||
RFP - Management and Operation of Courthouse Caferteria |
Lucy |
1/14/09 |
Awarded by Commissioner Court to Lumar on Monday, February 9, 2009 |
||||
Bid-Recreation Area Enclosures for the Detention Facility & Jail Annex |
Lucy |
2/4/09 |
Awarded by Commissioner Court to U.S. Fencing & Gate for the Jail Annex & El Paso Automated Office & Industrial Systems for the Detention Facility on Monday, March 30, 2009. Discussed again in cc on 6/15/09 - U.S Fencing & Gate could not hold price - Approved to rescind order to award for Jail Annex Enclosures to U.S Fencing & Gate and authorize to re-bid. |
||||
(RFP) Replace the Outdoor Concrete Stairs at the Detention Facility |
Linda |
1/14/09 |
Awarded by Commissioner Court to Lower Valley Concrete on Monday, February 9, 2009 |
||||
(RFP) Inspect and Repair the Exhaust Duct from the Boiler Room -12th Floor at the Detention Facility |
Linda |
1/14/09 |
Awarded by Commissioners Court to Mechanical Technologies, Inc., on Monday, February 2, 2009 |
||||
(RFP) Re-bid Self Luminous Exit Signs for the Detention Facility |
Linda |
12/30/08 |
RFP approved by Commissioners Court to re-bid on Monday, January 26, 2009 |
||||
RFP (3rd Re-bid) Intensive Out patient Drug Treatment Services for Juvenile Probation Department |
Linda |
12/29/08 |
08-174-tab | RFP was awarded by Commissioners Court to Aliviane Inc. and authorized to negotiate a contract on Monday, March 16, 2009 |
|||
08-173 disregard Pg 4 & 8 |
BID - Wheel Alignments for the Sheriff's Office Vehicles |
Lucy |
12/17/08 |
Bid Canceled |
|||
Bid - Exhaust System for the Sheriff's Office Vehicles |
Lucy |
12/17/08 |
Bid Canceled |
||||
Bid - Auto Parts for the Sheriff's Office Vehicles |
Lucy |
1/14/09 |
Awarded to low bidder as per spreadsheet on Commissioners Court on June 1, 2009. |
||||
Border Colonia Access Project for Reconstruction of Road in NuWay Addition in the Upper Valley |
Linda |
12/17/08 |
Bid was awarded by Commissioners Court to Asphalt Pavers, Inc. on Monday, January 5, 2009 |
||||
(RFP) Replacement of the Kitchen, Bakery and Sally Port Sewer Lines for the Detention Facility |
Linda |
12/29/08 |
08-169-tab | RFP was awarded by Commissioners Court to TCB Contractors on Monday, January 26, 2009
|
|||
(RFP) Installation of Shut-Off Valves at the 2nd and 6th floor of the Detention Facility |
Linda |
12/29/08 |
08-168-tab | RFP was awarded by Commissioners Court to TCB Contractors on Monday, January 26, 2009
|
|||
(RFP) Drug Testing Laboratory Confirmation Services for Juvenile Probation Department |
Lucy |
12/10/08 |
On Monday, February 23, 2009Commissioners Court postponed for 3/2/08 and awarded to Pharamatech |
||||
(Re-bid) Upgrade of Intelligence Vehicle for Sheriff's Office |
Lucy |
12/08/08 Monday |
Awarded by Commissioners Court to Sirchie
on Monday, 12/15/08 |
||||
(RFP) Medical Plan Stop Loss Insurance for the County of El Paso |
Linda |
12/3/08 |
08-165-tab | RFP was awarded by Commissioners Court to ING Employee Benefits on Monday, December 8, 2008 |
|||
BID - Two (2) Trucks for the Maintenance Section at the Detention Facility |
Lucy |
12/3/08 |
Awarded by Commissioners Court to Casa Ford on Monday, January 12, 2009 |
||||
Ten (10) Energy Star Windows for the Park, Golf and Aquatics Office |
Linda |
12/4/08 |
08-163-tab | Awarded by Commissioners Court to New Look Improvement on Monday, January 5, 2009
|
|||
(RFQ) Remodeling of Ascarate Golf Course Clubhouse Bathrooms |
Linda |
11/19/08 |
Awarded by Commissioners Court to Basic IDIQ on Monday, February 2, 2009
|
||||
(RFQ) Architectural Services for Air Distribution System - Ascarate Golf Course Clubhouse |
Linda |
11/19/08 |
Awarded by Commissioners Court to Jevas, Inc., d/b/a Trinity Consulting on Monday, February 2, 2009 |
||||
(RFQ) Architectural and Landscape Design Services for Ascarate Park |
Linda |
11/19/08 |
Awarded by Commissioners Court to Sites Southwest LLC on Monday, February 2, 2009 | ||||
BID Transmission Services for the Sheriff's Office |
Lucy |
11/19/08 |
Approved to reject & re-bid by Commissioners Court on Monday, February 23, 2009 |
||||
Bid Radiator Services for the Sheriff's Department |
Lucy |
11/19/08 |
Approved to reject & re-bid by Commissioners Court on Monday, February 23, 2009 |
||||
Food Products for the County of El Paso |
Linda |
11/19/08 |
Bid was awarded by Commissioners Court to low bidders as per spreadsheet on Monday, December 8, 2008 |
||||
Re-bid Tortilla Products for the Detention Bureau Division |
Linda |
11/12/08 |
Awarded by Commissioners Court to Border Eagel Dist. Inc. on Monday, November 24, 2008 . |
||||
Re-bid (RFP) Automated Screening, Assessing, and Case Management System for JPD |
Linda |
11/12/08 |
RFP was awarded by Commissioners Court to Allvest Information Services on Monday, March 9, 2009 |
||||
Bid - Tire for the Sheriff's Department |
Lucy |
11/12/08 |
Awarded by Commissioners Court on Monday, February 23, 2009 to A to Z tire and Battery; GCR Tire Centers; and Gray's Wholesale. |
||||
BID - Automotive Batteries for the Sheriff's Office |
Lucy |
11/17/08 Monday |
Bid Canceled |
||||
RFP- At Home Alcohol Monitoring Services for the 234th District Court |
Lucy |
12/4/08 |
RFP awarded on in Commissioners Court on Monday, January 5, 2009 to Elmo Tech. |
||||
RFP Upgrade of the Boiler Room, Pumps, Regulators, and Water Lines for the Detention Facility |
Lucy |
11/12/08 |
Awarded by Commissioners Court to Mechanical Technologies, Inc. on Monday, 12/15/08. |
||||
(RFP) County's Workers' Compensation Third Party Administrator |
Linda |
11/6/08 |
Awarded by Commissioners Court to NovaPro Risk Solutions, LP on Monday, November 24, 2008 . |
||||
(RFP) Resurface the Kitchen and Bakery Floor at the Detention Facility |
Linda |
11/20/08 |
Awarded by Commissioners Court to Monopoly
on Monday, January 5, 2009 |
||||
(RFP) Professional Counseling Services for Inmates in the Detention Facility and Jail Annex |
Linda |
11/6/08 |
RFP was awarded by Commissioners Court to Sergio Galvan on Monday, December 8, 2008 |
||||
(Re-bid) Heavy Equipment for Ascarate Park, Golf Course and Aquatics Department |
Linda |
10/15/08 |
08-147-tab | Awarded by Commissioners Court to Forklift Enterprises, Inc. on Monday, November 10, 2008 |
|||
Re-bid (RFP) Video News Releases Provider for Border Children's Health Collaborative |
Linda |
10/16/08 |
08-146-tab | To reject all bids and re-bid approved by Commissioners Court on Monday, December 15, 2008 |
|||
Re-bid Exterior/Interior and Communication Equipment for the Patrol Vehicles |
Lucy |
10/08/08 |
Awarded on Commissioners Court on 10/20/08 to low bidders as per spreadsheet |
||||
Re-bid RFP Furnish & Install Fire Suppression System at MDR Building |
Lucy |
10/08/08 |
Awarded on Commissioners Court on 10/20/08 to Essential Protection Systems. |
||||
RFQ Federal Legislative Lobbyist Services for the County of El Paso |
Lucy |
10/06/08 Monday |
Commissioners appointed a committee on November 24, 2008- Holly, Piti, Jaime, Auditors. Approved and Authorize County Judge to sign agreement w/Austin Copelin & Reyes LLP on 12/8/08 |
||||
RFQ State Legislative Lobbyist Services for the County of El Paso |
Lucy |
10/06/08 Monday |
Commissioners appointed a committee on November 24, 2008- Holly, Piti, Jaime, Auditors. Approved and Authorize County Judge to sign agreement w/Bickerstaff Heath & Delgado Acosta LLP on 12/8/08 |
||||
Janitorial, Chemical and Paper Products for the County of El Paso |
Linda |
10/3/08 |
08-141-tab | Awarded by Commissioners Court on October 27, 2008 to low bidders as per spreadsheet. |
|||
Tortilla Products for the Detention Bureau Division |
Linda |
10/1/08 |
Reject and Re-bid by Commissioners Court on Monday, October 20, 2008 |
||||
Milk Products for the Detention Bureau Division |
Linda |
10/9/08 |
08-139-tab | Awarded by Commissioners Court to Prices Creamers on Monday, October 20, 2008 |
|||
Bread Products for the Detention
Bureau
Division |
Linda |
10/1/08 |
Awarded by Commissioners Court to Flowers Baking Company on Monday, October 20, 2008 |
||||
(RFQ) Inmate Medical Services for the Detention Facility and Jail Annex |
Linda |
12/8/08 |
08-137-tab | Authorized Sheriff's Department to negotiate with Prison Health Services by Commissioners Court on Monday, February 23, 2009
|
|||
RFP Replace the T-12 Fluorescent Lamps to T-8 Fluorescent Lamps for the Detention Facility |
Lucy |
9/10/08 |
Awarded in Commissioners Court
on Monday, October 13, 2008 to Eco Worx, Inc. |
||||
BID Industrial Shredder for County Clerk's Archives Division |
Lucy |
9/10/08 |
Yes |
Commissioners Court on Monday, October 13, 2008 to Office Communications Systems |
|||
Kitchen Equipment for the Detention Facility |
Linda |
9/11/08 |
Awarded - line item to low bidders by Commissioners Court on Monday, November 03, 2008 |
||||
(RFP) Collections Software for the County Clerk's Collections Division |
Linda |
11/26/08 |
08-133-tab | To Reject and Re-bid by Commissioner Court on Monday, February 9, 2009
|
|||
Hot Food Buffet Unit for Juvenile Probation Department |
Linda |
9/11/08 |
Awarded by Commissioners Court to Buller Fixture on Monday, November 10, 2008 |
||||
(Re-bid) Ten (10) Pick-Up Trucks for Sheriff's Office |
Linda |
8/27/08 |
Awarded by Commissioners Court to Dick Poe Motors on Monday, September 15, 2008 |
||||
(Re-bid) Upgrade of Intelligence Vehicle for Sheriff's Office |
Linda |
8/27/08 |
Reject and Re-bid by Commissioners Court on Monday, November 10, 2008 |
||||
BID 27 Cottonwood Vigas to Replace Damaged Vigas at the San Elizario Jail |
Lucy |
8/27/08 |
Commissioners Court rejected bids authorized phone bids on Monday, October 20, 2008 |
||||
BID 15 Passenger Van for the Jail Annex |
Lucy |
8/27/08 |
Yes |
Awarded by Commissioners Court on Monday, October 13, 2008 to Caldwell Country |
|||
(RFP) Walk-in Freezer and Cooler Upgrade for the Detention Facility |
Linda |
9/11/08 |
Awarded by Commissioners Court to Texas Cold Front. on Monday, October, 13. 2008 |
||||
X-Ray Machine Maintenance for the County Courthouse |
Linda |
8/20/08 |
Awarded by Commissioners Court to L-3 Communications Security and Detection Systems, Inc. on Monday, September 15, 2008 |
||||
(RFP) Video News Releases Provider for Border Children’s Health Collaborative |
Linda |
8/28/08 |
Authorized Purchasing to reject all bids and re-bid by Commissioners Court on on Monday, September 15, 2008 |
||||
Reconstruction of Roads in Sylvia Andrea and Cuna del Valle |
Linda |
8/20/08 |
Awarded by Commissioners Court to Allied Paving Company on Monday, September 8, 2008 |
||||
BID Eight (8) Air-Pak, Sixteen (16) Carbon Cylinders and Fifty (50)Gas Masks |
Lucy |
8/27/08 |
Yes |
Awared by Commissioners Court on Monday, October 13, 2008 to Hegemeyer North America --Victor( buyer) handled phone bid Awarded to GT Distributor on 11/12/08 |
|||
BID One (1) Kawasaki Mule for the Jail Annex |
Lucy |
8/21/08 |
Commissioners Court approved to go out for phone bids on Monday, September 15, 2008 --Joe handled phone bids -awarded to Edge Motorsports |
||||
BID Sedan for the Jail Annex |
Lucy |
8/20/08 |
Bid was discussed in Commissioners Court on Monday, September 15, 2008 approved to use State or Tarrant Bids. No bids received. Dept. requested to end bid. Approved in CC on June 8, 2009 for No Action. |
||||
Eastlake Blvd. and Darrington Road Signalization Project |
Linda |
8/13/08 |
08-120-tab |
Awarded by Commissioners Court to Tri State Electric on Monday, August 25, 2008 |
|||
(RFP) Upgrade Two (2) ADA Shower Stalls for the Detention Facility |
Linda |
8/20/08 |
08-119-tab | Awarded by Commissioners Court to T-Dyne Contractors LLC, on Monday, October, 13. 2008 |
|||
(RFP) 100 Self Luminous Exit Signs for the Detention Facility |
Linda |
8/13/08 |
To reject all bids and re-bid by Commissioners Court on Monday, October 27, 2008 |
||||
Bid Copiers for the County of El Paso |
Lucy |
9/17/08 |
Postponed by Commissioners Court on 10/27/08 -Awarded by Commissioners Court to low bid on amended spreadsheet on 11/3/08 |
||||
Bid Ammunition for the Sheriff's Office |
Lucy |
8/20/08 |
Yes |
Awarded by Commissioners Court to GT Dist. on Monday, September 8, 2008 |
|||
BID Construction of Phase IA-Tornillo-Guadalupe New International Bridge Major Arterial Roadway |
Lucy |
9/10/08 |
Awarded by Commissioners Court on Monday, October 6, 2008 to C&C Road Contractors. |
||||
Computer and Software Equipment for the Amber Project |
Linda |
8/21/08 |
08-114-tab | Awarded by Commissioners Court on October 20, 2008 to low bidders as per spreadsheet. |
|||
BID Hardware Maintenance on Dell Servers and Racks |
Lucy |
8/13/08 |
Yes |
Awarded in Commissioners Court on September 15, 2008 to Solid Systems CAD Services, Inc. |
|||
BID Twelve Focus Vehicles for CID & Civil Division at the Sheriff' Office |
Lucy |
8/6/08 |
Dept issued ck (forfiture) |
Awarded by Commissioners Court to Casa Ford on Monday, September 8, 2008 |
|||
BID Exterior/Interior and Communication Equipment for the Patrol Vehicles |
Lucy |
8/6/08 |
No |
Approved by Commissioners Court on August 25, 2008 to re-ject & re-bid (08-145) |
|||
BID Thirty-seven (37) Mobile Computer Terminals |
Lucy |
8/6/08 |
Postponed
on 9/15/08, 9/22/08 --Awarded on September 29, 2008 by Commissioners Court to CDWG for MCT's & related items, awarded to RCT for console and VRM's & related items. |
||||
Thirty (30) Cameras, Twenty Five (25) Monitors and Eight (8) Cyber Domes |
Linda |
8/21/08 |
* |
Awarded by Commissioners Court to low bid on Monday, October 27, 2008 |
|||
(RFP) Exterior Insulations and Finish System Repair for the Jail Annex |
Linda |
8/21/08 |
08-108-tab | * |
Awarded by Commissioners Court to El Paso Pavement Specialist on Monday, September 8, 2008 |
||
(RFP) Payroll, Human Resources, Budget System for the County of El Paso |
Linda |
8/14/08 |
08-107-tab | * |
RFP was rejected by Commissioners Court on Monday, September 29, 2008 |
||
(RFP) Automated Screening, Assessing and Case Management Tool for Juvenile Probation Department |
Linda |
8/21/08 |
08-106-tab | * |
Authorized Purchasing to reject all bids and re-bid by Commissioners Court on on Monday, September 15, 2008 |
||
(Re-bid) RFP Intensive Outpatient Drug Treatment Services |
Linda |
8/21/08 |
08-105-tab | * |
To reject all proposals and approved to re-bid by Commissioners Court on Monday, November 10, 2008 |
||
BID Cisco Equipment or the MDR Building |
Lucy |
07/30/08 |
Yes |
Awarded by Commissioners Court on Monday, August 18, 2008 to Communication Professionals Inc. (Subject for equipment to be smart net certified.) |
|||
BID Two Boilers & Two 534 Gallon Hot water Storage Tanks for the Jail Annex |
Lucy |
08/06/08 |
Yes |
Awarded by Commissioners Court to T-DYNE Contractors LLC on Monday, September 8, 2008 |
|||
Lift Station Sewage Pumps at the Jail Annex |
Linda |
08/6/08 |
* |
Awarded by Commissioners Court to T-DYNE Contractors LLC on Monday, August 25, 2008 |
|||
Ten Roof Top Units for the Jail Annex |
Linda |
08/14/08 |
08-101-tab | * |
Awarded by Commissioners Court to S&M Sheet Metal Works on Monday, September 8, 2008 |
||
One Washer and Two Dryers for the Jail Annex |
Linda |
8/06/08 |
08-100-tab | * |
Awarded by Commissioners Court to Skyline Equipment, Inc. on Monday, November 24, 2008 . |
||
Cargo
Style
Mini Van for Information Technology Department |
Linda |
7/30/08 |
08-099-tab | * |
Bid will be discussed in Commissioners Court on Monday, August 18, 2008 |
||
Sally Port Doors for the Jail Annex |
Linda |
7/30/08 |
08-098-tab | * |
Awarded by Commissioners Court on Monday, August 18, 2008 to Desert Garage Doors |
||
(RFP) Heating Supply Fan Upgrade for the Detention Facility |
Linda |
7/30/08 |
08-097-tab | * |
Awarded by Commissioners Court on Monday, August 18, 2008 to HoneyWell Intenational |
||
(RFP) Juvenile Drug Court Treatment Services |
Linda |
8/07/08 |
08-096-tab | * |
Awarded by Commissioners Court to Aliviane Inc. on Monday, September 15, 2008 |
||
(RFP) Computer and Information Systems Hardware |
Linda |
7/23/08 |
* |
Awarded by Commissioners Court to the lowest bidders - ACS Enterprise Soultions, Checkpoint Services, Desert Communications, Dell Marketing L.P. on Monday, August 4, 2008 |
|||
(RFQ) Data Center Consultant |
Linda |
7/24/08 |
* |
RFQ was a No Action, RFQ Closed by Commissioners Court Monday, 4/13/09.
|
|||
(BID) Exterior & Interior Lighting Packages for (9) Constable Vehicles |
Lucy |
7/16/08 |
Yes * |
Awarded by Commissioners Court on 7/28/08 to R.T.C., Inc. |
|||
(BID) Equipment for the (9) Constable Vehicles |
Lucy |
7/16/08 |
Yes * |
Awarded by Commissioners Court on 7/28/08 as per spreadsheet |
|||
(RFP) Fire Alarm System for the Jail Annex |
Linda |
7/24/08 |
* |
Awarded by Commissioners Court on Monday, August 18, 2008 to Matrix Special Systems |
|||
(RFP) Cooling Supply Upgrade Fan for the Detention Facility |
Linda |
7/24/08 |
* |
Awarded by Commissioners Court on Monday, August 18, 2008 to T-Dyne Contractors |
|||
(RFP) Elevator Equipment Modernization for the Detention Facility |
Linda |
7/31/08 |
08-089-tab | * |
Awarded by Commissioners Court on August 18, 2008 to Thyssenkrupp Elevator |
||
Two (2) Mixers for the Jail Annex |
Linda |
7/10/08 |
* |
Awarded by Commissioners Court on Monday, August 4, 2008 to Kamaran & Co. |
|||
(RFP) Health Plan Benefits Program Services |
Linda |
7/31/08 |
* |
Awarded by Commissioners Court on October 8, 2008 (special session) to the following:
On 12/15/08 Section 125 and 132 Plan Administration: rescind award change to award to Diversified.Third Party Medical & Dental Claims Administration Services: Foresight TPA, Inc. Managed Medical Network Access: Foresight TPA, Inc. Utilization Review and Management: Foresight TPA, Inc. COBRA and HIPPA Administration: Foresight TPA, Inc. On-Site Clinic Administration: Foresight TPA, Inc. Section 125 and 132 Plan Administration: Butterworth & Macias, P.C. Pharmacy Benefit Management: Medco
|
|||
Industrial Dishwasher for the Jail Annex |
Linda |
6/25/08 |
* |
Awarded by Commissioners Court on 7/14/08 to National Restaurant Supply Co. Inc. |
|||
Double Deck Ovens for the Jail Annex |
Linda |
6/25/08 |
* |
Awarded by Commissioners Court on Monday, August 4, 2008 to Kamaran & Co. |
|||
Sally Port Doors for the Jail Annex |
Linda |
6/25/08 |
no-tab |
* |
Reject and rebid. |
||
(RFP) Preservation of the San Elizario Jail |
Lucy |
7/30/08 |
No
BID CLOSED |
Commissioners Court
approved to re-ject all bids and authorize Road & Bridge Dept. to manage the preservation of the San Elizario Project and select vendors in the community to accomplish the various components on Monday, August 25, 2008 |
|||
(BID) Furnish & Install a New FM200 Clean Agent fire Protection System for ITD at the MDR Building |
Lucy |
7/16/08 |
No |
Commissioners Court
approved to re-bid on Monday, August 25, 2008 |
|||
(BID) One (1) 2008 Truck for Facilities Management |
Lucy |
6/18/08 |
Yes |
Awarded by Commissioners Court on 7/07/08 to Planet Ford. |
|||
ADA Front Doors for the Detention Facility |
Linda |
6/18/08 |
* |
Authorized Purchasing to reject all bids and re-bid by Commissioners Court on 7/07/08. |
|||
(12) Food Carts for Detention Facility and (20) Food Carts for Jail Annex |
Linda |
6/18/08 |
* |
Awarded by Commissioners Court on 7/14/08 to A-Tex Restaurant Supply Inc. |
|||
Reconstruction of Roadways in Valle Villa Units 1 & 2 |
Linda |
6/18/08 |
* |
Awarded by Commissioners Court on 7/07/08 to Allied Paving Company |
|||
(BID) Two (2) 12-15 Cu. Yd. Dump Truck Beds |
Lucy |
6/11/08 |
Yes |
Awarded by Commissioners Court on 7/07/08 to Fabco Industries Inc. |
|||
(RFQ) Engineering Services for Phase II of Canutillo Drainage Project |
Lucy |
7/2/08 |
Commissioners Court discussed on July 14, 2008 to select committee to downsize list & veiw presentations. |
||||
Twenty (20) Video Systems for Surveillance Equipment - Sheriff's Department |
Linda |
6/11/08 |
* |
Bid was rejected by Commissioners Court on Monday, September 29, 2008 |
|||
H.M.A.C. Labor Overlay Program for Road & Bridge |
Linda |
6/11/08 |
* |
Awarded by Commissioners Court on on 6/23/08 to Asphalt Pavers Inc. |
|||
H.M.A.C. Material Overlay Program for Road & Bridge |
Linda |
6/11/08 |
* |
Awarded by Commissioners Court on on 6/23/08 to Jobe Materials, L.P. |
|||
(RFI) Payroll, Human Resources and Budget System |
Linda |
6/11/08 |
* |
Approved and Authorized by Commissioners Court on 7/07/08 to proceed with and RFP. |
|||
(RFQ) Electrical Engineering Services - Ascarate Park, Golf Course Clubhouse Aquatics Administrative |
Linda |
6/12/08 |
* |
Awarded by Commissioners Court on on 6/30/08 to RBM Engineering, Inc. |
|||
(Bid) Parking Curbs for Ascarate Park, Golf Course and Aquatics Department |
Lucy |
6/11/2008 |
Yes |
Awarded by Commissioners Court on 7/07/08 to Amcon Construction Inc. |
|||
Heavy Equipment for Ascarate Park, Golf Course and Aquatics Department |
Linda |
6/4/08 |
* |
To reject all bids and re-bid approved by Commissioners Court
on 6/16/08. |
|||
Paving Oil for Road & Bridge Department |
Linda |
6/12/08 |
* |
Awarded by Commissioners Court on on 6/23/08 to NK Asphalt Partners d/b/a Holly Asphalt Company. |
|||
(RFQ) Architectural Services for the Youth Services Center |
Linda |
6/4/08 |
* |
Awarded by Commissioners Court on 10/27/08 to Wright and Dalbin Architects Inc. |
|||
(RFP) Scalable Web Content Filter/Traffic Management System |
Lucy |
6/11/08 |
Yes |
Awarded by Commissioners Court on 7/07/08 to External Technologies. |
|||
(RFP) Microsoft Premier Support Services |
Lucy |
6/4/08 |
Yes |
Awarded by Commissioners Court on 6/16/08 to Microsoft Corp. |
|||
(RFP) Dual Itanium Server Solution for the County's Justice Information Management Sysetm |
Lucy |
6/11/08 |
Yes |
Awarded by Commissioners Court on on 6/23/08 to Desert Communictions, Inc. c/o PO Issued to Hewlett Packard |
|||
(BID)Furnish and Install one each 20-ton Up-flow Air Conditioning Unit in the MDR |
Lucy |
5/28/08 |
Yes * |
Awarded by Commissioners Court to Gonzalez Mechanical Contractors Communictions, Inc. on 7/14/08 |
|||
(RFQ) Design/Build of (2) Two New Restrooms at Ascarate |
Lucy |
6/4/08 |
Approved by commissioners court on 6/16/08 for Piti Vasqez to review and make recommendation-- County Judge to sign contract w/Licon Engineering Associates on 9/15/08 |
||||
(BID) Emergency Response Vehicle for the Sheriff's Office |
Lucy |
5/21/08 |
Approved by Commissioners Court on 6/9/08 to awared to The Armored Goup. |
||||
(RFQ) Design/Build Services--4th Floor Renovation of the El Paso County Courthouse |
Lucy |
5/28/08 |
No action on 6/16/08-Approved by Commissioners Court on 7/21/08 for Purchasing to negotiate contract with Dantex. Postponed on 5/11/09 and 5/18/09 Approved - change order number one to guaranteed maximum price design & construction agreement w/Dantex Construction Co. for remodeling of 2nd & 4th floors of courthouse . |
||||
Operation of the Cafeteria located at the Sheriff's Office Headquarters |
Lucy |
5/21/08 |
Yes |
Awarded by Commissioners Court on on 6/30/08 to Lumar Enterprise Inc. |
|||
(BID) Property located at 1410 Coach Road, Canutillo, Texas 79835 |
Lucy |
5/14/08 |
Sold |
No bidders---Property auctioned off on Aug. 4, 2008 @ 9:00a.m. Sold for $59,500.00 ($2,000 down) |
|||
Ten (10) Pick-Uptucks for Sheriff's Office |
Linda |
5/14/08 |
* |
To reject all bids and re-bid approved by Commissioners Court on 6/16/08. |
|||
(RFQ) Data Center Design Project |
Linda |
**** |
****** |
* |
Formal RFQ canceled. |
||
(RFP) Iron Port Anti-Virus Software Maintenace |
Lucy |
5/14/08 |
Yes * |
Awarded by Commissioners Court on 6/2/08 to M & S Technologies |
|||
Food Products for the County of El Paso |
Linda |
5/07/08 |
08-054-tab-1 08-054-tab-2 |
* |
Awarded to low bidders as per spreadsheet by Commissioners Court on 6/2/08 |
||
(RFP) (3) Three Generators & (1) Fire Pump Engine Maintenance Serice |
Lucy |
5/28/08 |
Yes * |
Awarded by Commissioners Court on on 6/23/08 to Southwest Commercial Engines. |
|||
(RFI) Energy Efficiency & Demonstration Projects-County Facilities |
Lucy |
5/7/08 |
* |
Information approved by CC |
|||
(BID) 8 Patrol Vehicle for the Constables |
Lucy |
5/14/08 |
Yes |
Approved by Commissioners Court on 6/2/08 to Purchase (9) Impalas for the Constables from Tarrant Bid. |
|||
Upgrade of Intelligence Vehicle for Sheriff's Office |
Linda |
5/01/08 |
* |
To reject all bids and re-bid approved by Commissioners Court
on 6/16/08. |
|||
RFQ for Engineering Material Testing for Ysleta Annex Project |
Linda |
4/23/08 |
* |
Awarded by Commissioners Court on on 6/23/08 to Jaime Rojas, d/b/a CQC Testing and Engineering |
|||
RFQ for Engineering Material Testing for Border Colonia Access Projects |
Linda |
4/23/08 |
* |
Awarded by Commissioners Court on on 6/23/08 to Raba-Kistner Consultants (SW), Inc. |
|||
Two (2) 52,000 G.V.W Truck/Chassis for Road & Bridge |
Linda |
4/23/08 |
* |
Awarded by Commissioners Court on 5/5/08 to Southwest Sterling, Inc. |
|||
Uninterrupted Power System for the Jail Annex |
Lucy |
4/30/08 |
yes |
Awarded by Commissioners Court on 5/19/08 to Emerson Network Power (Liebert) |
|||
(BID) 25,000 Gallons of Chlorine |
Lucy |
4/16/08 |
yes |
Awarded by Commissioners Court on on 4/28/08 to DPC Industries, Inc. (po) |
|||
(BID) Workstations for the County Clerks /Archives Office |
Lucy |
4/23/08 |
Yes |
Awarded by Commissioners Court on on 6/30/08 to Intermax Inc. Please note discussed on CC again on 1/5/09 awarded vendor couldn't provide & rescinded court order & authorize Purchasing to award to NBC or utilize existing contract. Awarded to NBS |
|||
(BID) One (1) Ford F-150 Supercrew Truck for the Constables Office |
Lucy |
4/16/08 |
No |
On 5/19/08 Commissioners Court deleted, will put new item on agenda w/ pricing of Crown Vic's, Impalas and gas mileage. |
|||
(Re-bid) HVAC Professional Services for Rehab and Re-construct Homes in the County of El Paso |
Linda |
4/23/08 |
* |
Awarded by Commissioners Court on 5/12/08 to Southwest HVAC Services |
|||
(Re-bid) Plumbing Professional Services for Rehab and Re-construct Homes in the County of El Paso |
Linda |
5/1/08 |
* |
Authorized Purchasing to reject all bids and to solicit for phone bids. By Commissioners Court on 5/19/08. |
|||
(RFQ) Design Build for the Construction of an Additional Jail Pod at the Jail Annex |
Lucy |
5/21/08 |
On 6/9/08 Commissioner Court selected Committee--Purchasing, R&B, and Cheif Messick to give a short list of interviewers. 6/16/08 no action,-6/27/08 approved to negotiate w/Urban On 8/4/08 cc authorize PA to continue to negotiate w/Urban for the design of the Sheriff Support building, design of Jail Pod & construction of support buildin. |
||||
Toxicology Services for the Medical Examiners Office |
Linda |
4/2/08 |
* |
Awarded by Commissioners Court on 4/28/08 to NMS Labs |
|||
(RFP) Employee Service for Constrution Work for Renovation of the MDR Building |
Lucy |
5/16/08 |
No |
No Bidders |
|||
(BID) Emergency Generator for the MDR |
Lucy |
4/23/08 |
yes * |
Awarded by Commissioners Court on 5/12/08 to Blair-Hall Co., Inc. |
|||
(BID) Wiring of Data & Communicaiton for MDR Building |
Lucy |
5/14/08 |
Yes |
Awarded by Commissioners Court on 5/19/08 to Inovative PBX Service Inc. |
|||
Maintenance Contract for Copiers for the Adult Probation Department |
Linda |
***** |
****** |
No |
Formal Bid canceled. |
||
(RFP) Inmate Commissary Service for the Detention Facility & Jail Annex |
Linda |
5/01/08 |
* |
Awarded by Commissioners Court on Monday, July 28, 2008 to Aramark |
|||
(BID) Bulk Fuel for the County of El Paso |
Lucy |
5/14/08 |
Yes as needed R&B * |
Postponed on 6/23/08--Awarded by Commissioners Court on on 6/30/08 to Western Refining Wholesale. |
|||
(RFP) Materials & Installation of New Flooring for the Reg. VIII Academy Computer Lab Floor |
Lucy |
4/3/08 |
Issued check (forfiture) |
Awarded by Commissioners Court on 4/28/08 to KD Scholten Co. |
|||
H.M.A.C. Labor for Border Colonia Project Sylvia Andrea |
Linda |
3/26/08 |
* |
Awarded by Commissioners Court on 4/7/08 to Asphalt Pavers |
|||
H.M.A.C. Material for Border Colonia Project Sylvia Andrea |
Linda |
3/26/08 |
* |
Awarded by Commissioners Court on 4/7/08 to Jobe. |
|||
(Re-bid) RFI for Redaction Software for the County Clerk's and District Clerk's Office |
Linda |
4/10/08 |
* |
RFI no action by Commissioners Court on Monday, September 29, 2008 |
|||
(BID) Management for Two (2) County Parking Facilities |
Lucy |
5/07/08 |
No |
Reject and rebid by Commissioners Court on 7/28/08 |
|||
Fourteen (14) Patrol Vehicles for the Sheriff's Department |
Linda |
03/19/08 |
* |
Awarded by Commissioners Court on 4/14/08 to Casa Ford. |
|||
Sixteen Passenger Van for the Border Children’s Mental Health Collaborative |
Linda |
03/19/08 |
* |
Awarded by Commissioners Court on 4/7/08 to Caldwell Country Chevrolet. |
|||
(Re-bid) Replacement of Carpet Tile at the County Courthouse 6th & 8th Floors |
Linda |
03/19/08 |
* |
Awarded by Commissioners Court on 4/7/08 to Rio Grande Contract Furnishings, dba BPSI |
|||
Tortilla Products for the Detention Bureau Division |
Linda |
03/19/08 |
* |
Awarded by Commissioners Court on 4/14/08 to Border Eagle Dist. |
|||
Bread Products for the Detention Bureau Division |
Linda |
03/19/08 | * |
Awarded by Commissioners Court on 4/14/08 to Flowers Baking |
|||
Milk Products for the Detention Bureau Division |
Linda |
03/19/08 | * |
Awarded by Commissioners Court on 4/14/08 to Prices Creameries |
|||
(RFP) Janitorial Services for the Sheriff's Office |
Lucy |
4/16/08 |
Yes |
Awarded by Commissioners Court on 5/12/08 to Maintenance Unlimited |
|||
(RFP) Shelving for the County Clerk's Archives Division at the Sheriff's Annex |
Lucy |
3/19/08 |
Yes * |
Awarded by Commissioners Court on 4/21/08to Indoff, Inc. |
|||
Crime Scene Truck for the Sheriff's Department |
Linda |
03/12/08 |
Yes |
Awarded by Commissioners Court on 4/14/08 to Caldwell Contry Chevrolet. |
|||
(RFP) Family Skills Training for the Juvenile Probations Department |
Linda |
03/19/08 |
Yes |
Awarded by Commissioners Court on 7/07/08 to Pinnacle Social Services LLC. |
|||
(BID) Installation of Carpet at the MDR Building |
Lucy |
03/12/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to Rio Grande Contract Furnishings, dba BPSI |
|||
(RFP) Modernization of Elevators at the County Courthouse |
Lucy |
03/05/08 |
No |
Awarded to ThyssenKrupp (5/5/08) by Commissioners Court on 6/9/08 Rescind court order to award toThyssenKrupp & reject all bid & rebid with new scope of work |
|||
(RFP) Modernization of Elevators at the MDR Building |
Lucy |
03/05/08 |
Yes |
Awarded by Commissioners Court on 5/5/08 to ThyssenKrupp Elevator, Resinded and awarded to Otis on 5/12/08 |
|||
(RFP) Intensive Outpatient Drug Treatment Services |
Linda |
03/20/08 |
No |
To reject all bids and re-bid approved by Commissioners Court on 6/16/08. |
|||
(RFP) Demolition of Old Juvenile Probation Detention |
Lucy |
03/06/08 |
Yes * |
Awarded by Commissioners Court on 4/1/408 to MFH Enviromental |
|||
Reconstruction of Roadways in Gonzalez & Brinkman Subdivision |
Linda |
03/13/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to Quest Constracting Inc. |
|||
(RFP) Heavy-Duty Natural Gas Vehicle Demonstration |
Linda |
03/05/08 |
Yes |
Awarded by Commissioners Court on 4/7/08 to Ruby Mountain, Inc. |
|||
Construction of Ysleta Annex |
Linda |
03/14/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to Dantex Construction |
|||
Officer Uniforms, Patches, Badges, and Insignias |
Lucy |
03/12/08 |
Yes as needed by dept. |
Awarded by Commissioners Court on 4/28/08 to Guardian Tactical.com & Uniforms of Texas |
|||
Roof Repair for the Mission Valley Annex |
Linda |
02/21/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to Frontier/Scholten Roofing |
|||
RFP General Electric Maintenance Services for the Dentention Facility |
Lucy |
2/13/08 |
Yes |
Authorized Purchasing to solicit for phone bids. By Commissioners Court on 3/24/08. |
|||
(Re-bid) Security Guard Services for Juvenile Probation Department |
Linda |
2/06/08 |
Yes |
Awarded by Commissioners Court on 4/28/08 to Allied Barton Security |
|||
Janitorial, Chemical and Paper Products for the County of El Paso |
Linda |
02/6/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to low bidder as per spreadsheet. |
|||
El Paso Hills Subdivision through TXDOT's Border Colonia Access Program |
Linda |
03/06/08 |
Yes |
Awarded by Commissioners Court on 3/24/08 to Jar Conrete Inc. |
|||
BID(Re-bid) Command & Control Trailer for the Homeland Security Section for the Sheriff's Office |
Lucy |
01/31/08 |
Yes - |
Awarded by Commissioner Court on 2/25/08 to ICS Technologies. |
|||
BID - Inmate Clothing, Towels, Blankets & Mattresses for the Sheriff's Office |
Lucy |
02/6/08 |
Yes as needed by dept. * |
Awarded by Commissioner Court on 4/7/08 to lowest as per spreadsheet & authorized to purchase mattress through TCI on CC 4/14/08 |
|||
RFP(Re-bid) WEB CT for the Region VIII Academy for the Sheriff's Office |
Lucy |
02/14/08 |
Yes * |
Awarded by Commissioners Court on 3/24/08 to Blackboard Inc. |