PAVING ACTIVITES

On Montwood Drive:

The contractor has finished paving the north side of Montwood between Zanzibar and Windrock.

On Windrock:

The contractor has finished placing the base course between Buckwood and Montwood, and is now compacting the area in preparation for paving activities that are soon to follow.

image

UTILITY AND SIDEWALK WORK

On Montwood Drive:

Between Honolulu and Monaco the contractor completed the box culvert walls, tops and floors.

Trenches for box culverts, which were previously poured on Trinidad and Honolulu were backfilled.

DETOURS

Posted detours remain in place along Montwood Drive between McRae and Yarbrough. Eastbound and westbound traffic will continue travelling in the lanes south of the median.

 

image

*Information provided by City of El Paso: Engineering and Construction Management Department